000 | 01123ctmaa22002892i 4500 | ||
---|---|---|---|
003 | autArchive | ||
005 | 20240730163120.0 | ||
008 | 240522s1992 nz 000 0 eng d | ||
011 | _aautArchive (BATCH 22_05_2024 9.34.54 am): Converted from Spydus metadata | ||
035 | _a(SpydusIRN)212651 | ||
035 | _a(autArchive)ID1101 | ||
040 |
_aZ5A _beng _cZ5A |
||
043 | _au-nz--- | ||
245 | 0 | 0 | _a[Technical refresher leave report Michael Hope 1992]. |
264 | 0 | _c[1992] | |
490 | 1 |
_aMechanical and Production Engineering Department - technical refresher leave reports ; _v4 |
|
500 | _aMEPR/1010/4. | ||
500 | _aApprox. 50 p. | ||
583 |
_averified location _c20240614 _kST. |
||
610 | 2 | 7 |
_aAuckland Savings Bank Trust _2autArchive |
650 | 7 |
_aSabbatical leave _2autArchive |
|
700 | 1 |
_aHope, Michael H., _eauthor |
|
710 | 2 |
_aDepartment of Mechanical and Production (AIT) _g[ID1101031600], _eauthor _91284230 |
|
830 | 0 |
_aMechanical and Production Engineering Department - technical refresher leave reports (MEPR/1010) ; _v4 |
|
852 | 4 |
_3236650 _cBox No.: 197-1 _jMEPR/1010/4 |
|
942 |
_cSC_MAN _ka |
||
999 |
_c1907256 _d1907256 |