000 | 02624cam a2200385 i 4500 | ||
---|---|---|---|
005 | 20230526151143.0 | ||
008 | 110601s2001 enk b 001 0 eng d | ||
011 | _aBIB MATCHES WORLDCAT | ||
020 |
_a0333800745 _qpbk. |
||
020 |
_a9780333800744 _qpbk. |
||
035 | _a(ATU)b11994861 | ||
035 | _a(OCoLC)45991166 | ||
040 |
_aUKM _beng _erda _cUKM _dOCLCQ _dUMC _dYDXCP _dAU@ _dATU |
||
042 | _apcc | ||
043 | _ae-uk--- | ||
050 | 4 |
_aTA183 _b.S45 2001 |
|
082 | 0 | 4 |
_a624.0287 _223 |
099 | _a624.0287 SEE | ||
100 | 1 |
_aSeeley, Ivor H., _eauthor. _91086785 |
|
245 | 1 | 0 |
_aCivil engineering quantities / _cIvor H. Seeley and George P. Murray. |
250 | _aSixth edition. | ||
264 | 1 |
_aBasingstoke ; _aNew York : _bPalgrave, _c2001. |
|
300 |
_avii, 294 pages : _billustrations ; _c25 cm |
||
336 |
_atext _btxt _2rdacontent |
||
337 |
_aunmediated _bn _2rdamedia |
||
338 |
_avolume _bnc _2rdacarrier |
||
500 | _aPrevious ed.: Basingstoke: Macmillan, 1993. | ||
504 | _aIncludes bibliographical references and index. | ||
505 | 0 | 0 |
_gPart 1. _tMeasurement Theory And Practice : -- _g1. _tScope and Context of Civil Engineering Work Measurement -- _g2. _tFundamental Principles of CESSM 3 -- _g3. _tMeasurement Practice and Bill Production -- _g4. _tCESMM 3: Classes A-D: Contract and Preparatory Site Matters -- _g5. _tCESMM 3: Class E: Excavation, Filling and Landscaping -- _g6. _tCESMM 3: Classes F-H: Concrete -- _g7. _tCESMM 3: Classes I-L: Pipework -- _g8. _tCESMM 3: Classes M-O: Metalwork and Timber -- _g9. _tCESMM 3: Classes P & Q: Piling -- _g10. _tCESMM 3: Classes R-T: Roads, Rails and Tunnels -- _g11. _tCESMM 3: Classes U-W: Walling, Painting and Waterproofing -- _g12. _tCESMM 3: Classes X-Z: Miscellaneous, Renovation and Incidental Works -- _gPart 2. _tWorked Examples : -- _g1. _tDemolition and Site Clearance -- _g2. _tExcavation and Filling -- _g3. _tMass Concrete Retaining Wall -- _g4. _tPrecast Prestressed Concrete Beams -- _g5. _tPumping Chamber -- _g6. _tSewage Holding Tank -- _g7. _tPumphouse -- _g8. _tStone Faced Sea Wall -- _g9. _tSewer -- _g10. _tWater Main -- _g11. _tSteel-Framed Gantry -- _g12. _tTimber Jetty -- _g13. _tHybrid Piles -- _g14. _tQuay with Concrete and Timber Piles -- _g15. _tSteel Sheet Piling -- _g16. _tNavigation Lamp Platform -- _g17. _tEstate Road -- _g18. _tRail Track -- _g19. _tTunnel -- _g20. _tSewer Renovation -- _g21. _tWater Main Renovation. |
650 | 0 |
_aCivil engineering _xEstimates _zGreat Britain _9746121 |
|
650 | 0 |
_aCivil engineering _xSpecifications _zGreat Britain. |
|
650 | 0 |
_aCivil engineering _xMeasurement _zGreat Britain. |
|
700 | 1 |
_aMurray, George P., _eauthor. _91086786 |
|
942 | _cB | ||
999 |
_c1222733 _d1222733 |