000 02280cam a22004334i 4500
005 20211102083318.0
008 021021s2003 njua b 001 0 eng d
010 _a 2002026369
011 _aBIB MATCHES WORLDCAT
020 _a0471413895
_qcloth (alk. paper)
020 _a9780471413899
_qcloth (alk. paper)
020 _a0471389374
_qWIE
020 _a9780471389378
_qWIE
035 _a(ATU)b10989006
035 _a(DLC) 2002026369
035 _a(OCoLC)50041632
040 _aDLC
_beng
_erda
_dATU
042 _apcc
050 0 0 _aTS177
_b.F324 2003
082 0 0 _a725.4
_221
100 1 _aTompkins, James A.,
_eauthor.
_9264478
245 1 0 _aFacilities planning /
_cJames A. Tompkins [and others].
250 _aThird edition.
264 1 _aHoboken, NJ :
_bJ. Wiley,
_c[2003]
264 4 _c©2003
300 _ax, 750 pages :
_billustrations ;
_c26 cm
336 _atext
_btxt
_2rdacontent
337 _aunmediated
_bn
_2rdamedia
338 _avolume
_bnc
_2rdacarrier
504 _aIncludes bibliographical references and index.
505 0 0 _gPt. 1.
_tDefining Requirements.
_gCh. 1.
_tIntroduction.
_gCh. 2.
_tProduct, Process, and Schedule Design.
_gCh. 3.
_tFlow, Space, and Activity Relationships.
_gCh. 4.
_tPersonnel Requirements --
_gPt. 2.
_tDeveloping Alternatives: Concepts and Techniques.
_gCh. 5.
_tMaterial Handling.
_gCh. 6.
_tLayout Planning Models and Design Algorithms --
_gPt. 3.
_tFacility Design for Various Facilities Functions.
_gCh. 7.
_tWarehouse Operations.
_gCh. 8.
_tManufacturing Systems.
_gCh. 9.
_tFacilities Systems --
_gPt. 4.
_tDeveloping Alternatives: Quantitative Approaches.
_gCh. 10.
_tQuantitative Facilities Planning Models --
_gPt. 5.
_tEvaluating, Selecting, Preparing, Presenting, Implementing, and Maintaining.
_gCh. 11.
_tEvaluating and Selecting the Facilities Plan.
_gCh. 12.
_tPreparing, Presenting, Implementing, and Maintaining the Facilities Plan.
588 _aMachine converted from AACR2 source record.
650 0 _aFactories
_xDesign and construction
_9317707
650 0 _aFacility management
_9317701
907 _a.b10989006
_b20-03-18
_c27-10-15
998 _a(2)b
_a(2)c
_b20-03-18
_cm
_da
_feng
_gnju
_h0
945 _a725.4 FAC
_g1
_iA293437B
_j0
_lcmain
_o-
_p$90.80
_q-
_r-
_s-
_t0
_u6
_v0
_w0
_x0
_y.i1226748x
_z29-10-15
942 _cB
999 _c1158000
_d1158000