000 | 03245cam a22004094i 4500 | ||
---|---|---|---|
005 | 20221101185457.0 | ||
008 | 010613s2002 ncua b 001 0 eng d | ||
010 | _a 2001003483 | ||
011 | _aBIB MATCHES WORLDCAT | ||
020 | _a1556177607 | ||
020 | _a9781556177606 | ||
035 | _a(ATU)b10168072 | ||
035 | _a(DLC) 2001003483 | ||
035 | _a(OCoLC)47142154 | ||
040 |
_aDLC _beng _erda _dATU |
||
042 | _apcc | ||
050 | 0 | 0 |
_aTJ217.5. _bB47 2002 |
082 | 0 | _a629.8 | |
100 | 1 |
_aBerge, Jonas, _eauthor. _91039642 |
|
245 | 1 | 0 |
_aFieldbuses for process control : _bengineering, operation, and maintenance / _cJonas Berge. |
264 | 1 |
_aResearch Triangle Park, NC : _bISA, _c[2002] |
|
264 | 4 | _c©2002 | |
300 |
_aviii, 460 pages : _billustrations ; _c26 cm |
||
336 |
_atext _btxt _2rdacontent |
||
337 |
_aunmediated _bn _2rdamedia |
||
338 |
_avolume _bnc _2rdacarrier |
||
504 | _aIncludes bibliographical references and index. | ||
505 | 0 | 0 |
_gChapter 1. _tIntroduction -- _tDigital Communication Networks -- _tAutomation Networking Application Areas -- _tHistory of Fieldbus -- _tEvolution of Control System Architecture -- _tBasic Network Differences -- _gChapter 2. _tBenefits, Savings, and Doubts -- _tRealizing Fieldbus Benefits -- _tAchieving Fieldbus Savings -- _tFieldbus Doubts Addressed -- _gChapter 3. _tInstallation and Commissioning -- _tHART -- _tIEC 61158-2 (Foundation Fieldbus H1 and PROFIBUS PA) -- _tEthernet and IP (Foundation HSE and PROFInet) -- _gChapter 4. _tConfiguration -- _tNetwork Configuration -- _tDevice Configuration -- _tControl Strategy Configuration -- _gChapter 5. _tIntegrate and Migrate -- _tHybrid I/O -- _tMigration -- _tIntegration -- _gChapter 6. _tTroubleshooting -- _tDevice -- _tCommunication -- _tControl Strategy -- _gChapter 7. _tOperation -- _tGetting the Most Out of Fieldbus -- _tConfiguring the Process Visualization -- _tPerformance Considerations -- _tOperating a Fieldbus Control Loop -- _gChapter 8. _tEngineering and Design -- _tConceptual Design and Functional Specification -- _tEngineering -- _tFactory Acceptance Test (FAT) -- _tSite Acceptance Test (SAT) -- _gChapter 9. _tMaintenance and Asset Management -- _tAsset Management-enabled Systems -- _tCalibrating Fieldbus Devices -- _tDiagnosing Fieldbus Devices -- _tPredicting Failures in Fieldbus Devices -- _tInformation from Fieldbus Devices -- _tReplacing Fieldbus Devices -- _gChapter 10. _tAvailability and Safety -- _tFault-tolerant versus Safe Systems -- _tImproving Availability -- _tImproving Safety -- _tBalancing Availability and Safety -- _gChapter 11. _tHow Fieldbuses Work -- _tPrimer -- _tPhysical Layer -- _tData Link Layer -- _tApplication Layer -- _tSystem Management and Network Management -- _tUser Layer -- _tFieldbus on Ethernet and IP -- _gAppendix A. _tSolutions to Exercises -- _gAppendix B. _tParameters Index -- _tIndex. |
588 | _aMachine converted from AACR2 source record. | ||
650 | 0 |
_aIntelligent control systems _9326868 |
|
650 | 0 |
_aProcess control _9322782 |
|
650 | 0 |
_aIndustrial electronics _9319242 |
|
907 |
_a.b10168072 _b11-07-17 _c27-10-15 |
||
942 | _cB | ||
945 |
_a629.8 BER _g1 _iA409682B _j0 _lcmain _o- _p$180.95 _q- _r- _s- _t0 _u1 _v1 _w0 _x1 _y.i10413273 _z28-10-15 |
||
998 |
_a(2)b _a(2)c _b06-04-16 _cm _da _feng _gncu _h0 |
||
999 |
_c1108831 _d1108831 |