Proposed Site Works.

Contributor(s): Material type: Mixed materialsMixed materialsSeries: General architectural building and site plans and other information related to the buildings. (DIRC/1024)Producer: [1998]Action note:
  • Condition: Good.
  • verified location 20240716 ST.
Tags from this library: No tags from this library for this title. Log in to add tags.
Holdings
Item type Current library Call number Status Date due Barcode
Mixed Materials (Special Collections) City Campus Library Special Collections Drawer No.: 508-7: 18 (Browse shelf(Opens below)) Available
Browsing City Campus shelves, Shelving location: Library Special Collections Close shelf browser (Hides shelf browser)
Drawer No.: 508-7: 18 Concepts. Drawer No.: 508-7: 18 Learning Centre & A Building Refurbishment. Drawer No.: 508-7: 18 Preliminary Study Level . Drawer No.: 508-7: 18 Proposed Site Works. Drawer No.: 508-7: 18 The Learning Centre - AIT Wellesley Campus. Drawer No.: 508-8 12 days to go till the new Akoranga Library Opens. Drawer No.: 508-8 AIT Marae Project.

18.

236577 Condition: Good.

verified location 20240716 ST.

There are no comments on this title.

to post a comment.

Powered by Koha