12 days to go till the new Akoranga Library Opens.

Contributor(s): Material type: TextTextSeries: Auckland Institute of Technology (AIT). Promotional material. General information brochures, leaflets, guides, and handbooks [ID1101053960] ; Producer: [19uu-20uu]Subject(s): Action note:
  • Condition: Good.
  • verified location 20240716 ST.
Tags from this library: No tags from this library for this title. Log in to add tags.
Holdings
Item type Current library Call number Status Date due Barcode
Manuscript (Special Collections) City Campus Library Special Collections Drawer No.: 508-8 (Browse shelf(Opens below)) Available
Browsing City Campus shelves, Shelving location: Library Special Collections Close shelf browser (Hides shelf browser)
Drawer No.: 508-7: 18 Preliminary Study Level . Drawer No.: 508-7: 18 Proposed Site Works. Drawer No.: 508-7: 18 The Learning Centre - AIT Wellesley Campus. Drawer No.: 508-8 12 days to go till the new Akoranga Library Opens. Drawer No.: 508-8 AIT Marae Project. Drawer No.: 508-8 Akoranga Library Closed. Drawer No.: 508-8 Akoranga Library Concept Drawing.

240220 Condition: Good.

verified location 20240716 ST.

There are no comments on this title.

to post a comment.

Powered by Koha