Image from Coce

Construction project administration / Edward R. Fisk, PE, Wayne D. Reynolds, PE.

By: Contributor(s): Material type: TextTextPublisher: Boston : Pearson, [2014]Copyright date: ©2014Edition: Tenth editionDescription: xviii, 381 pages ; 29 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
ISBN:
  • 0132866730
  • 9780132866736
Subject(s): DDC classification:
  • 624.0684 23
LOC classification:
  • TH438 .F57 2014
Contents:
The project delivery system -- Responsibility and authority -- Resident project representative office responsibilities -- Documentation : records and reports -- Electronic project administration -- Specifications and drawings -- Using the specifications in contract administration -- Construction laws and labor relations -- Construction safety -- Meetings and negotiations -- Risk allocation and liability sharing -- Preconstruction operations -- Planning for construction -- CPM scheduling for construction -- Construction operations -- Value engineering -- Measurement and payment -- Construction materials and workmanship -- Changes and extra work -- Claims and disputes -- Project closeout.
Tags from this library: No tags from this library for this title. Log in to add tags.
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Book City Campus City Campus Main Collection 624.0684 FIS (Browse shelf(Opens below)) 1 Available A549706B

Includes bibliographical references and index.

The project delivery system -- Responsibility and authority -- Resident project representative office responsibilities -- Documentation : records and reports -- Electronic project administration -- Specifications and drawings -- Using the specifications in contract administration -- Construction laws and labor relations -- Construction safety -- Meetings and negotiations -- Risk allocation and liability sharing -- Preconstruction operations -- Planning for construction -- CPM scheduling for construction -- Construction operations -- Value engineering -- Measurement and payment -- Construction materials and workmanship -- Changes and extra work -- Claims and disputes -- Project closeout.

There are no comments on this title.

to post a comment.

Powered by Koha