Image from Coce

Civil engineering quantities / Ivor H. Seeley and George P. Murray.

By: Contributor(s): Material type: TextTextPublisher: Basingstoke ; New York : Palgrave, 2001Edition: Sixth editionDescription: vii, 294 pages : illustrations ; 25 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
ISBN:
  • 0333800745
  • 9780333800744
Subject(s): DDC classification:
  • 624.0287 23
LOC classification:
  • TA183 .S45 2001
Contents:
Part 1. Measurement Theory And Practice : -- 1. Scope and Context of Civil Engineering Work Measurement -- 2. Fundamental Principles of CESSM 3 -- 3. Measurement Practice and Bill Production -- 4. CESMM 3: Classes A-D: Contract and Preparatory Site Matters -- 5. CESMM 3: Class E: Excavation, Filling and Landscaping -- 6. CESMM 3: Classes F-H: Concrete -- 7. CESMM 3: Classes I-L: Pipework -- 8. CESMM 3: Classes M-O: Metalwork and Timber -- 9. CESMM 3: Classes P & Q: Piling -- 10. CESMM 3: Classes R-T: Roads, Rails and Tunnels -- 11. CESMM 3: Classes U-W: Walling, Painting and Waterproofing -- 12. CESMM 3: Classes X-Z: Miscellaneous, Renovation and Incidental Works -- Part 2. Worked Examples : -- 1. Demolition and Site Clearance -- 2. Excavation and Filling -- 3. Mass Concrete Retaining Wall -- 4. Precast Prestressed Concrete Beams -- 5. Pumping Chamber -- 6. Sewage Holding Tank -- 7. Pumphouse -- 8. Stone Faced Sea Wall -- 9. Sewer -- 10. Water Main -- 11. Steel-Framed Gantry -- 12. Timber Jetty -- 13. Hybrid Piles -- 14. Quay with Concrete and Timber Piles -- 15. Steel Sheet Piling -- 16. Navigation Lamp Platform -- 17. Estate Road -- 18. Rail Track -- 19. Tunnel -- 20. Sewer Renovation -- 21. Water Main Renovation.
Tags from this library: No tags from this library for this title. Log in to add tags.

Previous ed.: Basingstoke: Macmillan, 1993.

Includes bibliographical references and index.

Part 1. Measurement Theory And Practice : -- 1. Scope and Context of Civil Engineering Work Measurement -- 2. Fundamental Principles of CESSM 3 -- 3. Measurement Practice and Bill Production -- 4. CESMM 3: Classes A-D: Contract and Preparatory Site Matters -- 5. CESMM 3: Class E: Excavation, Filling and Landscaping -- 6. CESMM 3: Classes F-H: Concrete -- 7. CESMM 3: Classes I-L: Pipework -- 8. CESMM 3: Classes M-O: Metalwork and Timber -- 9. CESMM 3: Classes P & Q: Piling -- 10. CESMM 3: Classes R-T: Roads, Rails and Tunnels -- 11. CESMM 3: Classes U-W: Walling, Painting and Waterproofing -- 12. CESMM 3: Classes X-Z: Miscellaneous, Renovation and Incidental Works -- Part 2. Worked Examples : -- 1. Demolition and Site Clearance -- 2. Excavation and Filling -- 3. Mass Concrete Retaining Wall -- 4. Precast Prestressed Concrete Beams -- 5. Pumping Chamber -- 6. Sewage Holding Tank -- 7. Pumphouse -- 8. Stone Faced Sea Wall -- 9. Sewer -- 10. Water Main -- 11. Steel-Framed Gantry -- 12. Timber Jetty -- 13. Hybrid Piles -- 14. Quay with Concrete and Timber Piles -- 15. Steel Sheet Piling -- 16. Navigation Lamp Platform -- 17. Estate Road -- 18. Rail Track -- 19. Tunnel -- 20. Sewer Renovation -- 21. Water Main Renovation.

There are no comments on this title.

to post a comment.

Powered by Koha