Image from Coce

Facilities planning / James A. Tompkins [and others].

By: Material type: TextTextPublisher: Hoboken, NJ : J. Wiley, [2003]Copyright date: ©2003Edition: Third editionDescription: x, 750 pages : illustrations ; 26 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
ISBN:
  • 0471413895
  • 9780471413899
  • 0471389374
  • 9780471389378
Subject(s): DDC classification:
  • 725.4 21
LOC classification:
  • TS177 .F324 2003
Contents:
Pt. 1. Defining Requirements. Ch. 1. Introduction. Ch. 2. Product, Process, and Schedule Design. Ch. 3. Flow, Space, and Activity Relationships. Ch. 4. Personnel Requirements -- Pt. 2. Developing Alternatives: Concepts and Techniques. Ch. 5. Material Handling. Ch. 6. Layout Planning Models and Design Algorithms -- Pt. 3. Facility Design for Various Facilities Functions. Ch. 7. Warehouse Operations. Ch. 8. Manufacturing Systems. Ch. 9. Facilities Systems -- Pt. 4. Developing Alternatives: Quantitative Approaches. Ch. 10. Quantitative Facilities Planning Models -- Pt. 5. Evaluating, Selecting, Preparing, Presenting, Implementing, and Maintaining. Ch. 11. Evaluating and Selecting the Facilities Plan. Ch. 12. Preparing, Presenting, Implementing, and Maintaining the Facilities Plan.
Tags from this library: No tags from this library for this title. Log in to add tags.
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Book City Campus City Campus Main Collection 725.4 FAC (Browse shelf(Opens below)) 1 Available A293437B

Includes bibliographical references and index.

Pt. 1. Defining Requirements. Ch. 1. Introduction. Ch. 2. Product, Process, and Schedule Design. Ch. 3. Flow, Space, and Activity Relationships. Ch. 4. Personnel Requirements -- Pt. 2. Developing Alternatives: Concepts and Techniques. Ch. 5. Material Handling. Ch. 6. Layout Planning Models and Design Algorithms -- Pt. 3. Facility Design for Various Facilities Functions. Ch. 7. Warehouse Operations. Ch. 8. Manufacturing Systems. Ch. 9. Facilities Systems -- Pt. 4. Developing Alternatives: Quantitative Approaches. Ch. 10. Quantitative Facilities Planning Models -- Pt. 5. Evaluating, Selecting, Preparing, Presenting, Implementing, and Maintaining. Ch. 11. Evaluating and Selecting the Facilities Plan. Ch. 12. Preparing, Presenting, Implementing, and Maintaining the Facilities Plan.

Machine converted from AACR2 source record.

There are no comments on this title.

to post a comment.

Powered by Koha